The floor is constructed from 19mm marine ply, later builds will be fibre board maybe 12mm.
The old carpeted side floor panels were used to mark out the profile. The tricky bit is the cuts at the rear where clearance has to allowed for the side trims hence the big gap. The bolt holes that can be seen in the new floor are into existing rivnuts in the body that hold the tie down hoops.
Comments